Freight train service launched to connect Karachi Port with the rest of Pakistan on Monday. The huge and powerful dark green locomotive attached to a long line of big and small freight containers awaited the inauguration ceremony to be off on its way at the Hutchison Ports Pakistan, also known as the South Asia Pakistan Terminal, on Monday.
Then as soon as the ribbon was cut, it honked loudly while making the slouching guests sit up straight in their chairs as it chugged away on its new ballastless tracks. Expected to take away the traffic congestion caused by container trucks on roads and highways here, this freight train will reach its destination, Lahore, in up to four days.
The freight train service also coincides with the commissioning of a 3.7km, high-tech train track laid at the Hutchison Ports Pakistan connecting the facility to the rest of the country in a seamless manner through Pakistan Railway’s extensive network spread throughout the country.
This new track laid within the terminal comprised three rail sidings of 700 metres each alongside a crippled wagon sliding. The tracks are embedded in concrete and are ballastless, which is a better, albeit a more expensive option than the traditional sleeper/ballast design used in Pakistan. Switching between the tracks and signalling is carried out using a computer-based interlocking system, eliminating the need for manual switching. As many as three freight trains can be handled simultaneously using rubber-tyred gantry cranes with a quick turnaround. Another track can also be added.